FITTERS in collaboration with partners performed built Sports and community club house for Brattvåg IL, including locker rooms, training facilities and social areas, total building are is about 700 m2. Steel frame, roof, and HCS installation involved building the primary steel structure, followed by preparing the roof surface, installing the roofing material, and finishing with components like the ridge cap and flashing.
We installated HCS – a precast, prestressed concrete floor elements that has long continuous hollow spaces (voids) running through it. Key elements include securely fastening connections, preparing the surface properly, ensuring weather protection, and coordinating between different trad.



